Call us: 704-362-3144
HomeServicesPictures & DescriptionsFacilities Assessment 
Contact UsHistoryDrawings/SpecificationsProject List
Resume

Facility Assessment Projects
Scope of assessment:
1. Raise the deep end to maximum 5' depth
2. Assess all deck equipment 
3. Deck and pool edge elevations
4. Assess ADA accessibility
5. Assess for water loss 
6. Assess all circulation, sanitation and heating systems
7. Provide budget figures for all repairs and upgrades

​A sample of a typical report is available by request
A sample of a typical assessment proposal is available by request
50 METER 6 LANE POOL BUILT IN 1978

SCOPE OF ASSESSMENT INCLUDED THE ENTIRE BUILDING

OUR RESPONSIBILITY INCLUDED THE POOL, POOL DECK. POOL EQUIPMENT ROOM AND POOL CHEMICAL STORAGE ROOM.

REPORT TENDERED IN MAY OF 2017

CURRENTLY UNDER REVIEW BY THE CLIENT
BISHOP STATE COMMUNITY COLLEGE  
AUBURN UNIVERSITY INSTRUCTIONAL POOL
WARREN WILSON COLLEGE  
25 YARD 6 LANE POOL BUILT IN 1987

SCOPE OF ASSESSMENT INCLUDED THE ENTIRE BUILDING

OUR RESPONSIBILITY INCLUDED THE POOL, POOL DECK. POOL EQUIPMENT ROOM AND POOL CHEMICAL STORAGE ROOM.

REPORT TENDERED IN MAY OF 2013.  SAMPLE OF ASSESSMENT REPORTS, SCOPE OF WORKS AND PROPOSALS AVAILABLE BY REQUEST

UNDER RECOMMENDATIONS THE NATATORIUM BUILDING WAS DEMOLISHED AND THE POOL REMAINED EMPTY

IN 2017 THE COLLEGE HAD RECEIVED FUNDING APPROPRIATE TO START THE REBUILDING PROCESS.  AN ALUMINUM STRUCTURE WAS CHOSEN FOR THE NATATORIUM.  THE SCOPE OF THE BUILDING REPAIR WAS EXPANDED.  IN THE SPRING OF 2017 POOL DESIGN CONSULTANTS, INC. WAS BROUGHT ON BOARD TO PROVIDED SEALED AND APPROVED CONSTRUCTION DRAWINGS AND SPECIFICATIONS. 

IN DECEMBER 2017 PDC'S CONTRACT WAS EXTENDED TO PROVIDE POOL CONSTRUCTION MANAGEMENT, PROCUREMENT GUIDANCE AND OVERALL AQUATIC TECHNICAL SUPPORT AND COORDINATION FOR THE PROJECT. PROJECT IS CURRENTLY UNDERWAY WITH AN ANTICIPATED COMPLETION DATE IN NOVEMBER OF 2018