Call us: 704-362-3144
HomeServicesPictures & DescriptionsFacilities Assessment 
Contact UsHistoryDrawings/SpecificationsProject List
Resume


Forensic Assessment
        Filter and Filter media
        Pumps electrical and curves/flow
        Heaters 
        Sanitation System Controls
        Halogen Delivery Systems
        pH control System
        Salt regenerative Systems
        Water Level control systems
        Pipes
        Valves

        Pool Structure
        Pool Finishes
        Tile
        Slip Resistance
        Stainless Steel

        Compliance to Standards
            Health Department
            Design  
            Regulatory 
            Industry 
            ASTM  
            ANSI  
            Environmental 

        Typical Testing

            Bonding
            Ground
            Galvannic
            Electrical
            Tap Echo for voids
            Radar for rebar
            Slip resistance
            Material laboratory testing
            Rust 
            Thickness of stainless steel
            Passivation

Design Services
Feasibility study technical support for aquatic venues

Client Preference questionnaire

Aquatic venue narrative

Industry information in the form of handouts, URL references and samples for pool related materials and equipment 

Sizing and budgeting spread sheets

Team coordination with architect, Interiors, civil, electrical, fire, geotechnical, mechanical, plumbing and structural 

Research and coordination with local and state authorities which may include health departments, local water and sanitary sewer authorities, building code officials

Production of construction documents formatted to National AutoCAD and CSI standards.  Formatting can be adjusted to client requirements such as the Veterans Administration or the Department of Defense

Bid support

Construction Administration 
Value Engineering

Preconstruction and close out submittal review RFI

Change orders

Supplemental Drawings and/or instructions

Construction site observations
    Preconstruction coordination meetings
    Excavation
    Steel and embeds
    Application of concrete
    Application of pool finishes
    Assessment of pool equipment, piping and valve installation
    Post start
    Final inspection

Close outs 
    As builts
    Close out submittals